Search

MDL AFII CHASSIS 150

Manufacturer: Beckett
SKU: BECKETT:B7210
Product Availability: Out of stock
$704.62
This product must be purchased in increments of 1
i h
Beckett B7210 Burner Chassis, AFII 150, With Genisys Control

  • Specifications

    Chassis Capabilities


    • Capacities - Model AFII 150
    • 0.75 to 1.35 gph
    • 105,000 to 189,000 BTU/hr input

      Fuels
    • No. 1 or No. 2 heating oil (ASTM D396) only

      Dimensions (standard)
    • Height: 13-1/4'
    • Width: 14-1/2'
    • Depth: 6-5/8'

      Electrical Characteristics
    • Motor: 3450 rpm, NEMA M-flange, manual reset overload protection
    • Power Supply: 120 V./60Hz./1 phase
    • Ignition: 10,000 V./23 ma. secondary, continuous duty shielded transformer
    • Operating Load: 5.8 amps (maximum) 
    • Alternated Voltages or Frequency: Consult Customer Service

      Fuel Unit
    • Single stage or two stage


    Chassis Plan

    • Reduces Investment Up To 65%
    • Reduces Storage Space Up To 85%
    • Speeds Service Calls


      Performance Capabilities
    • One-Piece Flame Rentention Head
      Special stainless steel construction for high performance. Time proven design. Has standard ceramic head insulator which prevents flame radiation upon the combustion components. Also fills entry openings in most combustion chambers which blocks infiltration of hot combustion gases.
    • 1/4' Quick Connect Electrode Terminals
      Fittings standard to our industry assure positive contact at all times. Easy to service.
    • Interated Pump/Motor Assembly
      Standard pumps. Motor has service friendly keyhole flange.
    • Sturdy Die-Cast Aluminum Housing
      Has a smooth finish that keeps its like-new look for years.
    • Easily Read Air Control Dial
      Locks in place for easy-to-set, precise air intake through a large single port. Regulates air on the discharge side of the blower.
    • Single, Big Air Inlet
      Is on the opposite side of the burner--away from the pump--to fight lint buildup. Designed to accept 4' air supply duct with inlet cover removed.


Air Tube Combination Chart - AFII 150
Usable Air
Tube Length
Dimension A
AFII 150 Firing Rate In GPH
.75-1.00.85-1.201.10-1.251.15-1.35
5'FBX50HFXSFBX50HGXSFBX50HHXSFBX50HIXS
7'FBX70HFXSFBX70HGXSFBX70HHXSFBX70HIXS
9'FBX90HFXSFBX90HGXSFBX90HHXSFBX90HIXS

 
To Determine Air Tube Length
AFII To Determine Air Tube Length1.jpg
The Air Tube Length (Dimension A) is the distance from the front of the burner housing to the end of
Optional Supports
AFII Optional Supports1.jpg
Adjustable Mounting Flange Kit
AFII Adjustable Mounting Flange Kit.jpg
Flame Retention Heads
AFII Flame Retention Heads2.jpg
Products specifications
Manufacturer Beckett